Qinbrolly

Umbrella metal part

2-Fold Telescopic Shaft

Overview

Made by
Supply chain / partners
Materials
Carbon steel tube, electro-galvanised or chrome plated, Aluminium tube (lightweight version), Black epoxy or powder coating (design option)
Finish options
Chrome / nickel plating, Black epoxy or powder coat, Brushed aluminium, Matte anodised (aluminium version)

Selection tips

  • Two sections give about a 1:1.8 reduction, which suits longer shafts rather than compact ones.
  • The joint or swage and the lock hole are the two failure points: control both in the same fixture.
  • Protect the bore: a humid container rusts an unplated inner wall from the inside.
  • Against three-fold: two sections are straighter with fewer failure points, but the umbrella stays long.

Manufacturing process & quality control points

Qinxi in-houseSupply chain / partnersIn-house or supply chain
  1. 1

    Tube cutting

    Supply chain / partners

    Tube stock is cut to the length of each section. Cut squareness decides whether the sections butt cleanly when the umbrella is closed.

    Quality control points

    • Cut length and squareness · Caliper + squareness gauge per drawing · First article + 1 pc per 2 h
  2. 2

    Swaging and end forming

    Supply chain / partners

    Each section is swaged so the next smaller section can telescope into it, and the ends are formed to take the tube latches. Swaging too deep locks the sections; too shallow and the frame racks when open.

    Quality control points

    • Swage depth and section fit · Go / no-go gauge on each joint · First article + 1 pc per 2 h
    • Latch seat position · Fixture check per drawing · First article + 1 pc per 2 h
  3. 3

    Hole punching

    Supply chain / partners

    Holes for the latch, the runner stop and the rivets are punched. Burrs inside the tube from punching are a classic cause of a section that will not slide.

    Quality control points

    • Hole position and burr · Fixture + visual, no burr inside the tube · First article + 1 pc per 2 h
  4. 4

    Deburring and pre-treatment

    Supply chain / partners

    Sections are deburred and cleaned before finishing. Any swarf left inside the tube ends up jamming the telescoping action.

    Quality control points

    • Internal cleanliness · Blow-out and visual check · 100%
  5. 5

    Surface finishing

    Supply chain / partners

    Plating or coating is applied by the supply chain. On a telescopic shaft the coating adds thickness inside the bore as well, so the swage tolerance has to allow for it.

    Quality control points

    • Coating thickness · Thickness gauge per buyer spec · Per batch
    • Corrosion resistance · Neutral salt spray, 5% NaCl, 35 C (ISO 9227 / GB/T 10125) · Per batch
  6. 6

    Straightness and telescoping check

    Supply chain / partners

    Two sections only, so the swage is deep and the joint carries more bending than on a 3-fold shaft. The shaft is checked straight and cycled through full extension and retraction. A section that binds when dry will bind worse once the frame is loaded.

    Quality control points

    • Straightness · Roll on a flat plate, no visible wobble · First article + 1 pc per 2 h
    • Telescoping smoothness · Manual extend / retract x10 per shaft · 100%

Used in

Relevant compliance

Get a quote for 2-Fold Telescopic Shaft

Custom materials, finishes and logos available. Send your drawing or sample.

Request a quote